In the evening of 24 Jan, 2011, Nanjing High Speed Gear Manufacturing Co., Ltd. (hereinafter referred to as High Speed Company)...
The 8th Workers’ Congress of the Group Company was held successfully on 22 Jan, 2011. Mr. Hu Yueming, the President and General...
An order of 150 sets of main gearbox for 3MW double-fed wind turbines was signed recently between NGC and its customer. These 150 sets of gearboxes will be designed and...
Five industry standards for construction material which was drafted by the management of Nanjing High Accurate Drive Equipment Manufacturing Group Co., Ltd (referred as...
At 9:00am on 25 December, 2010, Mr. Hu Yueming, the Group company president pulled the trigger to start the long-distance race...
In the afternoon of 24th December, 2010, Mr. Liu Qi, the deputy director of the National Energy Administration, accompanied by...